31.10.2017 – 02.07.218 (Instytut Zrównoważonego Rozwoju Sp. z o.o.) the function of Supervision Inspector of construction and civil engineering within the execution of the task:

“Delivery along with installation of photovoltaic cells in Gmina [commune] Turośń Kościelna”

The scope of the works included:

1) Verification of project documentation

2) Investor supervision over delivery, installation due to elaborated projects and technological start-up of 59 sets of photovoltaic cells for individual recipients in Gmina Turośń Kościelna

3) Supervision over connecting micro power plant with electricity grid along with obtaining requirements for connection on behalf of the installation’s user.

Within the framework of the investment installation and exploitation of photovoltaic in the range from 2 kWp to 10 kW cells was executed. The devices were located on detached buildings in gmina Turośń Kościelna.

Value of the investment: PLN 1 417 606.56 gross