30.09.2014 – 30.12.2015 (Instytut Zrównoważonego Rozwoju Sp. z o.o.) Contract Manager in the team of the Contract Engineer and second Construction and Civil Engineering Supervisor within execution of investment:

“Construction of water treatment plant and modernization of water and sewage system in agglomeration Wysokie Mazowieckie”. The contract included 3 tasks:

Task 1. Modernization of water treatment plant.

The task included design and execution of modernization of water treatment plant with maximum efficiency 2 900 m3/d, 200 m3/h. Value of construction works: PLN 7 369 000.00 nett

Task 2. Modernization of general sanitary sewer.

The task included design and execution of general sanitary sewer with diameter 200 – 800 mm by non-excavatory methods. Modernization covered several sections of the general sanitary sewer with combined length of around 2780 metres. Value of construction works: PLN 4 000 000.00 nett

Task 3. Construction of municipal sewer treatment plant along with sewer pumping station.

The task included design and construction of municipal sewer treatment plant for Wysokie Mazowieckie agglomeration, RLM = 11 200, throughput Q = 1 344 m3/d, with mechanical  and biological treatment of sewer, processing and disposal of sediments and construction of sewer pumping station and general sanitary sewer. Value of construction works: PLN 11 300 000.00 nett

Contract is carried out as “design and build” under standards of FIDIC (yellow FIDIC).

Overall value of construction works: PLN 27 882 870.00 gross