04.2018 – 15.11.2018 (SGS Polska) – Construction and Civil Engineering Supervision Inspector within the framework of the task:

“Construction of liquid methane (LNG) evaporation station along with reduction and measurement station of increased average pressure in Mońki”

Station of regasification of liquefied LNG gas in Mońki includes, among others: two cryogenic tanks with total capacity around 65 000 m3 of regasified gas, two evaporating dishes, reduction and measurement station and associated infrastructure. Throughput of the reduction and measurement station amounts to Q=1250 m3/h, capacity of the tank amounts to 61030 l, throughput of regasification LNG gas station amounts to 1200 m3/h, throughput of evaporating dish amounts to 2800 Nm3/h.

Investor: PSG Sp. z o.o. Oddział Gazowniczy w Białymstoku [Gas Division in Białystok]

Value of works: around PLN 2 947 080.00 gross